This past weekend... "I need to swap NICs and change L2, re-logic the L3, clean up the patch panels, install PoE++, etc... shouldn't take long."
Three days later, mostly done.. no. Everything else got in the way, hastily cabled basic bare minimum in-place. Maybe I'll finish it up on Saturday.

